Potpuna vidljivost građevinskog portfelja za upravu
Učinak dobavljača, kritični materijali i izloženost isporuke
Ažurirano 3 Jul 2026, 13:01
AI uvid u nabavu
3 critical materials exceed acceptable lead-time thresholds
Stavke na kritičnom putu
Pravovremena isporuka
0 zakašnjelo
Vrijednost nabave u riziku
Dugi rokovi uvoza
Kritični materijali
3 kritičnih materijala u zoni rizika na aktivnim gradilištima. Dugoročne isporuke elektro i tračničke opreme odgađaju kritični put pruge. Prosječno vrijeme isporuke od 52 dana premašuje plan na 3 projekta. Preporuka: povećati učestalost koordinacije s dobavljačima i ugovoriti prioritetne isporuke.
A1 proširenje · Roadstone d.o.o.
28d lead
A1 proširenje · Celječar d.o.o.
42d lead
A1 proširenje · Freyssinet HR
56d lead
Pelješac – pristup · Cemex HR
38d lead
Pelješac – pristup · ArcelorMittal
52d lead
Pelješac – pristup · Mageba HR
44d lead
Vodovod Dalmacija · Peštan d.o.o.
25d lead
Vodovod Dalmacija · Grundfos HR
68d lead
Vodovod Dalmacija · Končar – Elektroindustrija
48d lead
Pruga ZG–RI · Voestalpine
90d lead
Pruga ZG–RI · Alstom
84d lead
Pruga ZG–RI · Đuro Đaković
56d lead
Učinak dobavljača (OTIF)
OTIF portfelja iznosi 93.8% uz 0 odgođenih isporuka. Kritični materijali — ETCS, signalizacija i armatura — čine najveću izloženost. Bez intervencije izloženost nabave može porasti na €44,631,050. Preporuka: pregledati ugovore s dobavljačima na pruzi Zagreb–Rijeka i aktivirati rezervne izvore.
HŽ Infrastruktura
Subcontract package
Ing-Grad d.o.o.
Subcontract package
Elektrocentar
Subcontract package
Brodogradilište Viktor Lenac
Subcontract package
Voestalpine
Track switches
Alstom
ETCS onboard units
Đuro Đaković
Catenary masts
Grundfos HR
Pump assemblies
ArcelorMittal
Marine steel piles
Freyssinet HR
Bridge bearings
Strabag AG
Subcontract package
FLSmidth
Subcontract package
Mageba HR
Expansion joints
Cemex HR
Prestressed concrete
Končar – Elektroindustrija
SCADA controllers
Celječar d.o.o.
Steel reinforcement
Roadstone d.o.o.
Asphalt mix
Peštan d.o.o.
Ductile iron pipes
Kamgrad d.d.
Subcontract package
Hrvatska elektroprivreda
Subcontract package
Vestas Wind Systems
Subcontract package
Materijal · Vodovod Dalmacija
Pump assemblies lead time 68d — Grundfos HR
Materijal · Pruga ZG–RI
Track switches lead time 90d — Voestalpine
Materijal · Pruga ZG–RI
ETCS onboard units lead time 84d — Alstom
Spor · Pruga ZG–RI
SUP-2025-003: Track component delivery window dispute — force majeure review
Kartica podizvođača →Spor · Kampus Split
ARB-2025-014: Variation claim on structural tolerances — mediation scheduled
Kartica podizvođača →Dobavljač · Pelješac – pristup
Supplier OTIF 91% — delivery risk on Pelješac – pristup
Kartica podizvođača →3 critical materials exceed acceptable lead-time thresholds
Portfolio supplier OTIF at 94% — target 95%
2 single-source dependencies on long-lead imported equipment
Procurement delays contributing to schedule compression on 2 corridors